For homes and businesses

Renovations that give a good building its next life

Whole-home remodels, commercial renovations, structural changes, and code upgrades, planned around what's behind the walls and the people still using the building.

Representative imagery

In shortWrought Builders renovates homes and commercial buildings in Spokane, Spokane Valley, Liberty Lake, Coeur d'Alene, Post Falls, and Hayden. Work includes whole-home remodels, kitchens and baths, structural changes like removing load-bearing walls, commercial interior renovations, and accessibility and code upgrades.

Scope

What we renovate

Renovation is mostly about the unknowns. We plan for them instead of pretending they won't show up.

Whole-home remodels

Layouts, kitchens, baths, and systems updated together, so the house works as one piece again.

Kitchens and baths

Full rebuilds with new plumbing, electrical, ventilation, and finishes.

Structural changes

Opening walls with engineered beams, adding headers, and reinforcing floors and foundations.

Commercial renovations

Interior refreshes, layout changes, and system upgrades, phased to keep tenants operating.

Accessibility and code upgrades

Ramps, restrooms, door hardware, and egress improvements that bring a building up to current requirements.

Exterior updates

Siding, windows, doors, and decks replaced with details that keep water out.

The process

How a renovation runs

Same stages, same reporting, whether the job takes six weeks or eighteen months.

  1. AssessmentWe look at existing conditions first, including framing, systems, and anything that suggests surprises behind the walls.
  2. Scope and priceA written scope and price with clear allowances, plus a plan for what happens if we find something unexpected.
  3. Protect and buildDust control, protected floors, and a work area set up so you can keep living or working in the rest of the building.
  4. FinishPunch list, cleanup, final inspections, and a walkthrough before we call it done.
Two builders reviewing plans on a table inside a framed house
Our standard

How we keep renovations calm

  • Honest assessments before anyone opens a wall.
  • Allowances and contingencies explained in plain language.
  • Protected spaces and daily cleanup.
  • Older-building know-how including lead-safe practices on homes built before 1978.
  • Changes in writing priced and approved before work.
  • Permits handled for structural, electrical, plumbing, and mechanical work.
Local knowledge

Older buildings, permits, and safety rules

Many homes in Spokane and Coeur d'Alene were built long before today's codes. For houses built before 1978, federal lead-safe rules require certified renovation firms whenever work disturbs painted surfaces, and Washington runs its own version of that program through the Department of Commerce. Older buildings can also contain asbestos, which local clean air rules generally require you to identify before renovation or demolition starts.

Structural, electrical, plumbing, and mechanical work almost always needs a permit, and which office issues it depends on where the property sits, not the mailing address. Our permit guide lists who handles what in each city.

Service areas

Renovation across the region

We take on renovation work in six cities across Spokane County, Washington and Kootenai County, Idaho.

FAQ

Renovation questions

Can we live at home during the remodel?

Often, yes. We set up dust control, protect the rest of the house, and plan the order of work so you keep a working kitchen or bath as long as possible. For whole-home remodels, some families choose to move out for the loudest weeks.

Do I need a permit for my remodel?

Cosmetic work like paint and flooring usually doesn't. Structural changes, new or moved plumbing, electrical circuits, and mechanical work usually do. We'll tell you which permits apply and handle the submittal.

What happens if you find a problem behind the walls?

We stop, show you what we found, and give you options with prices before we go further. Your contract spells out how these situations work before we start.

Do you handle homes built before 1978?

Yes, with lead-safe work practices and testing where needed. Older homes also get a closer look for asbestos and outdated wiring before we open anything up.

Start a project

Tell us what you're building.

A commercial building, a custom home, a renovation, or a portfolio that needs a dependable partner. Send a few details and we'll take it from there.

Prefer to talk? [Phone number][Email address]

What are you planning?

A real person reads every message. Your details stay with us.

Start a project